The aim of the renovation is to minimise the static and dynamic loads, as well as to extend the service life of the individual bells through a smooth clapper strike while at the same time ensuring good sound generation.

The reasons for the renovation are doubts about the fatigue strength of the existing steel yokes and the steel belfry, as well as high wear on the existing bronze bells.

At the beginning of the assembly, the material had to be lifted through the acoustic windows with the help of a crane. Then the new oak belfry could be set.

 

The belfry consists of a mostly self-tensioning construction with three partitions and two tiers, with offsets, tenons, plating and retightenable connection elements.